19 Feb 2026
Main video
Engineering Report
Detected changes
Completion of plastering works and preparation of the surface for final paint coats
Execution of waterproofing and thermal insulation for the building roof and elevator rooms
Presence of building materials (red bricks) and stockpiles in the front setback area
Progress reading
Although the recorded percentage is 0%, the images show a different reality where the structural framework is 100% complete and external plastering is finished, indicating that the project is in the final finishing stages.
vs previous visit
Comparing current images with previous ones (from the same date), there are no tangible visible differences, indicating that the photos were taken during the same period or that no progress occurred during this short interval.
Expected next milestones
Removal of metal scaffolding, installation of glass windows and doors, and commencement of external paving and landscaping works.